Exterior shrink wrappes

The following work will be happening for the surgical expansion project this week:

DAY:

  • Construction behind the hoarding in perioperative unit
  • Construction on the link bridge above perioperative and Ruakopito
  • Work in the plant room above surgical unit
  • Reinforcing steel being installed in basement.

NIGHT:

  • Noisy drilling into wall between main corridor and perioperative unit (Monday and Tuesday). For any visitors leaving after 7:30pm on these days, the main corridor and reception area will be very noisy.
  • Steel being moved into the basement.

Thank you all for your patience during this work.

 